Project Overview

The project comprised 2 phases; phase 1 the design and construction of a new build Aldi store with a 132-space carpark, associated external works and extensive infrastructure and highways alterations. Phase 2 extended the infrastructure highway to facilitate a development site for EuroGarages to provide a petrol filling station plus tow drive through operations.

Highlights

  • The project also included the design and construction of 70,000sq.ft of industrial accommodation as the final phase of development.
  • The site is situated next to the Highways Agency’s Tarbuck Compound and a trading DAF Trucks servicing station, both of which remained operational and live throughout the construction of the project.
  • To facilitate Phase 2 of the project two stopping up orders were required to differing areas, this was managed during the Phase 1 pre-construction phase.
  • Client: Henry Boot Barnfield Limited
  • Location: Cronton Road, Huyton
  • Sector: Retail/F&B/ Industrial
  • Procurement: Negotiated
  • Services: Employer’s Agent / Quantity Surveying & Quantity Surveyor

Key Facts

retail

40,000 sq ft

Aldi store

industrial

70,000 sq ft

Industrial space